BYE-BYE COAL โ€ข ENERGY NEWS UPDATE โ€ขย EIA NEWS โ€ข CAPACITY NEWS

According to the plant’s owner, after 54 years of providing power to Pennsylvania and New York, the Homer City Generating Station in Pennsylvania will close by July 2023. The 1,888-megawatt coal plant began generating electricity in 1969 when Units 1 and 2 entered service. Unit 3 was added in 1977.

Coal plants nationwide are retiring; U.S. coal-fired capacity has contracted from 313 gigawatts (GW) in 2005 to around 196 GW today. The Homer City coal-fired power plant was built before the turn of the century. It was designed to provide baseload power, operating nearly continuously to meet the minimum regional power demand.

#EIA map of coal-fired power plants, March 2023 Homer City
<em>Homer City EIA map of coal fired power plants March 2023<em>

Recently, coal plants have struggled to effectively compete in competitive U.S. power markets against newer, more efficient, natural gas-fired, combined-cycle power plants.

The Homer City plant was built near coal reserves and included a high-capacity (345 kilovolts) transmission line to service areas in western New York and eastern Pennsylvania. For 30 years, the plant operated almost continuously, achieving a utilization rate, called a capacity factor, near 90%.

In 1999, the Homer City plant sold for $1.8 billion, corresponding to when Pennsylvania was deregulating its electricity market. At that time, coal-fired generation accounted for about 53% of the nation’s power supply; natural gas only accounted for about 12%. Since then, those roles have nearly reversed; natural gas is now the source of 40% of the electricity in the United States, and coal has dropped to 20%.

Homer City Capacity Factor Chart: EIA
<em>Homer City Capacity Factor Chart EIA<em>

The market landscape changed for the Homer City plant at the turn of the century. New emissions standards for power plants under the Clean Air Act required the plant to install FGD scrubbers on Unit 3 in 2001 and on Units 1 and 2 in 2014โ€”pollution control upgrades in 2014 cost the plant owners $750 million. Ownership of the plant changed after bankruptcy in 2017.

Driven by the ramp-up of drilling and fracking to produce natural gas from the region’s Marcellus and Utica shale formations, many new natural gas-fired power plants were built in Pennsylvania.

Unfortunately, as new natural gas-fired plants were built, the Homer City plant was dispatched more intermittently for load following instead of for base load. This change increased annual maintenance costs for the Homer City plant on top of the debt incurred from the pollution control upgrades.

Load-following plants adjust their power output as electricity demand fluctuates throughout the day and season. In contrast, base load power plants are usually run at near maximum output and are only taken offline to perform annual maintenance or repairs. As the Homer City plant became less competitive economically and was dispatched for load following rather than baseload power, the plant generated less electricity, and its capacity factor dropped. The Homer City plant was operated at an annual capacity factor of 82% in 2005. The capacity factor dropped to 20% in 2022, contributing to the decision to retire the plant.

Source: EIA.gov